“Construction of a cable car with a family recreation center”, investor is OOO Progress-Invest, the investment volume is 237 million rubles, and the project’s design capacity is 791 people per hour for the cable car road.
The lower landing station of the cable car road begins at the Old Castle restaurant and hotel complex, while the upper landing station is situated on the Kotkh Ridge The height difference from the lower to the upper station of the cable car is 260 m. The cable car spans a distance of 773 meters.
The project was successfully implemented in 2022 within the framework of the protocol of intentions on cooperation in the field of investment, signed at the Russian Investment Forum in Sochi in 2017. As a result of the project implementation, 126 jobs were created.
The lower landing station of the cable car road begins at the Old Castle restaurant and hotel complex, while the upper landing station is situated on the Kotkh Ridge The height difference from the lower to the upper station of the cable car is 260 m. The cable car spans a distance of 773 meters.
The project was successfully implemented in 2022 within the framework of the protocol of intentions on cooperation in the field of investment, signed at the Russian Investment Forum in Sochi in 2017. As a result of the project implementation, 126 jobs were created.
Wholesale and retail store of fruit and vegetables with storage facilities
Investor
OOO Agricultural Production Company “Produkt Kubani”
Implementation timeline:
2022
Volume of investments:
55 mln rubles
«This is a shop that engages in both wholesale and retail trading of fruit and vegetable products. It comes equipped with storage facilities and is backed by the investor OOO Agricultural Production Company “Produkt Kubani”. The investment volume for this project is 55 million rubles, with a project capacity of 5 thousand tons.
The project was successfully carried out in 2022 under the agreement for cooperation in investment.
The project was successfully carried out in 2022 under the agreement for cooperation in investment.
Construction of the third stage of the multi-storey residential complex Swan Lake is underway
Investor
OOO Terem-SZ
Implementation timeline:
2023
Volume of investments:
1421 mln rubles
The multi-storey residential complex Swan Lake (3rd stage) is being constructed by OOO Terem-SZ with an investment volume of 1,421 million rubles.
An eight-building modern residential complex, each building standing nine stories tall.
The project was successfully carried out in 2023 under the investment cooperation agreement signed at the Russian Investment Forum in Sochi in 2017.
An eight-building modern residential complex, each building standing nine stories tall.
The project was successfully carried out in 2023 under the investment cooperation agreement signed at the Russian Investment Forum in Sochi in 2017.